BARD Building

Progress Environmental teamed up with the Berg Corporation for the monumental redevelopment of BCCC’s Bard Building, located at 600 E Lombard St in Baltimore.  To access the 60,000+ SF of cementitious panels that once covered the exterior of the building, Progress used a 125’ boom lift to reach the deepest parts of the unique-shaped structure.  Exciting changes are on the horizon for this historic site!

  • 178,000 sq ft. 6 floors
  • 60,000 sq ft exterior cementitious siding

Our Team

  • Chris Druin, Director of Field Operations
  • Nelson Mejia, Supervisor

Helpful Links